Monday, 18 May 2015

Earthquakes Do Not Kill People, Improperly Designed Structures Do!

Earthquakes Do Not Kill People, Improperly Designed Structures Do!

Earthquake is a natural calamity, which can occur any time anywhere. Buildings raised on stilts,with no walls in the ground storey — are more likely to collapse. Therefore, the Buildings must be built in such a way that they are safe during and after such occurrence.


Nepal Earthquake Tragedy – Why did the quake cause so much damage?

12th May 2015 - Magnitude 7.3

25th April 2015 – Magnitude 7.8







Nepal is located in South Asia, home to one fifth of humanity and one of the most earthquake-prone regions in the world.  The region experiences some 100,000 minor quakes every year, and one of magnitude 8 or greater every 25 years. Yet lax building standards densely populated urban centers and poorly planned towns make the region's people extremely vulnerable to the fallout from tremors.

 “Most of the newly built houses that were destroyed by the earthquake in the commercial areas of Kathmandu had not followed the prescribed building code”, authorities have said.

Scores of houses that collapsed in places like Gongabu, Balaju, Kalanki, Thamel and Chabahil areas had initially acquired clearance to build two- or three-storey structures for residential use.

But the buildings were gradually transformed into high-rises without fulfilling the legal and technical requirements after the areas turned into commercial hotspots.


Read more at - http://www.masterspmc.com/blog/114-earthquakes-do-not-kill-people-improperly-designed-structures-do

Tuesday, 14 April 2015

Facts on Summer Safety

Facts on Summer Safety 

Summer in most part of India is extreme. The construction workers who are exposed to extreme heat or outdoor hot work environment may be at risk of heat stress and other occupational illnesses, which may have impact on productivity & other injuries also. Since work has to continue even in such environment let’s ensure that our workers are safe and comfortable in their working conditions.

The facts about extreme heat pic2

  • Extreme heat causes death.
  • Heat related injuries are preventable.
  • Dehydration contributes to heat injury.

Following are more vulnerable to get heat related injuries

  • People that work under hot & humid condition.
  • People  with  certain  medical  conditions  like  Heart  disease,  diabetes,  obesity  or  high  blood  pressure  &  on  certain  medications like medications for depression, insomnia etc... 
  • Aged People and adolescent.


Heat cramps  are severe cramping of muscles because of  dehydration usually while carrying out physical activity in the heat.
Treatment for heat cramps is to rest in the shade, get near a fan, spray the person with water and massage the cramp
 
Heat rash is skin irritation caused by excessive sweating.                     
Get medical advice

Thursday, 19 March 2015

Safety Has No Holiday - A Case Study !

Safety Has No Holiday - A Case Study !

A group workers (helper category) of Sub-contractor were assigned the job of housekeeping in under construction Tower on Sunday at about 8:00 am by main contractor. Injured Person was working alone in OTS shaft for debris removal, while accessing the chajja at other side of OTS the victim lost balance and had fall at about 8.40am from 2nd floor level (approx. 5.15 mt from gr floor) leading to right leg & right hand mid finger fracture & minor cuts & scratches on face. Injured Person was wearing his all PPE's safety helmet, safety shoes and safety harness, however he didn't anchor his harness and hence there was free fall to ground. Also the primary protection safety net at first floor level OTS was partly left open by the victim after cleaning of the debris and hence could not arrest the person from free fall.

Assumption No 1

pic11The victim may have tried to reach chajja from the top opening of toilet. At the time of passing from that opening he may have lost his grip from brick wall of  toilet and fell from that point.

2 Nos broken bricks were available as shown in the figure. But it is doubtful since1.9m height is difficult for the victim to go down until he decided to jump and there was no ladder available at vicinity of that area.

Assumption No 2
The victim might climbed by any means (which later may have taken out from that area) and at the time of climbing down to the other side of toilet he jumped and lost control.pic12
If anybody tries to jump from 2.4m and at the platform of 0.5m it is very much possible to be topple.



Assumption 3
pic14Another assumption was made that the victim may be have tried to reach the chajja by means of a 100mm channel section,which was available at the adjacent unit of the area. The victim and his crew member may be placed the channel at that  opening and after that victim tried to reach the area from over the channel.During going from the channel he may have lost  his control and  fall down
The victim may have fallen the channel but there were no evidence available that shows the channel has been put on the opening.Here also it was doubtful that the channel weight is approx . 25kg which is not possible for one person to put  at place  whereas all other gang members told the victim was alone at that place.

Events leading to the incident/accident


1.Unplanned work - Work without work permit  and prior intimation is not permissible but Contractor violated this protocol and conducted the work without giving any prior intimation to PMC and without obtaining any valid work permit

pic15

2. Lack of Supervision - The work was planned a night before without any prior intimation to PMC and the supervisor allowed the work to happen in his absence and left the activity unsupervised.

3. Negligence of Safety Equipment - Although the victim was wearing full body safety harness but he didn't anchor the safety belt.


Findings on overall approach and safe work practices adopted at site


The victim was working without work permit for the net/chajja cleaning work under the instruction of supervisor of Contractor. As per Client safety guideline no work should be executed without written work permit and written permit always requires authorization of work by concern Contractor’s project personnel and thereafter, approval of PMC personnel. In this regard the Client safety guidelines for work permit system was violated.

In addition to this, the work was carried out in absence of any supervisor which is also a major failure of site management of Contractor.

As per established system, if any work other than routine maintenance and housekeeping work at ground level, is  required to be executed on Sundays and other Holidays, the Contractor is supposed to inform the same in advance to PMC so that in turn, PMC also makes necessary arrangement to ensure their presence at site. In this case, no such prior intimation was given to PMC and established practice was bypassed.

While working, the victim was wearing full body safety harness but he didn’t anchor the hook of safety harness anywhere and therefore, the fall from height was not arrested.

It is also noticed that because of unplanned work, no hook locking arrangement was provisioned at work place and the working area was unsafe.

Learning from Case Study


1. All work whether routine or non-routine on holidays (productive/ non-productive) shall be given equal importance and supervision and safety measures must.

2. Critical height work with difficult approach shall be well planned after HIRA and permit to work.

3. Passive protection safety measures (safety nets, hard barricading, lifelines, shaft & cut-outs enclosures etc.) shall not be tampered or removed without permission of Tower In charge and Safety In charge. This is life threatening offense and punitive action must.

4. Emergency support services like first aid, firefighting aids, emergency vehicle, operators/ drivers etc. shall be operative/available for holiday or odd working hours.

5. Ensure that the Contractor, PMC and Client are conducting self-safety assessment through corporate/ cluster safety head/ safety coordinators frequently at least quarterly and improvements are factored and evaluated.

6. Permit is strong administrative control tool and if adhered strictly work will proceed safely after spot inspections/ corrections. There shall be zero tolerance approach to PTW procedural deviations.

About Masters

Masters is a leading Project Management company providing end-to-end solutions to the Construction Industry using the best of global standards and practices with primary focus on Real Estate sector.

Since its inception in 2004, the Company has evolved as a one-stop-shop service provider, offering a range of services to its Clients taking the project from start to finish – ranging from assisting them during per-development stages to feasibility analysis, pre-construction and construction & installation management services to all the way to a successful close out. In addition, Masters also specializes in Cost Consultancy and Design Development (Architectural as well as MEP) through their in-house team. Besides, Masters also offers Programme & Process Review Services and Quality, Cost & Safety Audit/ Monitoring Services and is well equipped to offer range of Development solutions (like turnkey, design & build, construction management at risk) to its Clients.

To know more about Project Management Consultancy, Contact us at :

Masters Management Consultants (India) Private Limited
New Udyog Mandir,
Kamanwala Chambers No.2,
Unit No. 7, Ground Floor,
Mugal Road, Mahim (West),
Email - connect@masterspmc.com
Phone : +91 22 64567600

Friday, 20 February 2015

PMC Services for Hotel development

PMC Services for Hotel development

Tourism and hospitality, a key sector of the Indian economy, plays a key role in the growth of Brand India.It is important to realize up front that there is much more to the process than only construction and operation of the Hotel.
Traditionally, hotel opening efforts have been driven by corporate operations, invariably supported by task force teams drawn from existing hotels. This specific approach only works on a small scale and has several limitations.
The traditional approach alone cannot meet the challenges and dynamics of new hotel development on a large scale and will contribute to causing delays in the technical, operational and commercial readiness of hotel projects.
Development of Hospitality industry on a larger scale generates specific dynamics and challenges. It requires proven project management expertise to meet these challenges head on and improve the efficiency and effectiveness of opening new hotels, right from pre-construction to construction to substantial completion and then final operational stages of a hotel. 
In our view, 
“A project is a temporary endeavor undertaken to create a unique product, service, or result. The temporary nature of projects indicates a project has a definite beginning and end.” (PMI, 2013).
It is important to understand that by definitions new hotel openings are essentially projects and not part of on-going hotel operations. The approach to manage them should fundamentally not be different from projects conducted in information technology, consulting, banking, telecommunications, aerospace, and other industries.
 Project management process for Hotel development includes the following:
  • Due Diligence
  • Site Assessment & Building Studies
  • Design Review & Conceptual Pricing
  • Design Team Selection, Negotiation, Contracting & Management
  • General Contractor Selection, Negotiation, Contracting & Management
  • Consultant Selection, Negotiation, Contracting & Management
  • Constructability Planning
  • Cost Analysis & Value Management
  • Budget Development & Analysis
  • Schedule Development & Analysis
  • Project Management Controls
  • Change Management
  • Quality Control and Compliance with Design Standards and Brand Standards
  • MEP System Commissioning Support
  • FF&E Procurement and Management
  • Operations and Pre-Opening Planning
  • Project Close-Out and Punch List Management
A  PMC should have the ability to oversee and manage an entire project (from design through completion of the punch list) in the most cost effective way for an owner.  It must have the expertise, the systems and right quality people which can enable the PMC to readily identify potential cost savings in design, purchasing, and construction that the operator or the developer may not know. The PMC should have in-house skill set for the identification of value-added opportunities and the detailed management of costs while maximizing the return on invested capital.
About Masters
Masters with experience of working on various Hotel developments can provide you an experienced project and construction management team whether you are building an entirely new hotel or renovating an existing one. We also offer a full breadth of consulting services to advise you about your hotel construction or renovation project.
Some of the Hospitality projects under our umbrella are:

Talk to us today!
Contact
connect[at]masterspmc[dot]com
Phone Number
+91 22 64567600

 

Tuesday, 20 January 2015

Common hurdles faced by PMC's

Common hurdles faced by PMC's 

Project Managers across the world face challenges on a day-to-day basis, not only on project levels but also at the organizational level. While most of these challenges are easy to resolve, whilst some are which need a more dedicated and systematic approach to resolve, especially when dealing with resources of the home organization.

Masters, like any other professional company, have not remained inexperienced from such hurdles during their journey, but have certainly resolved the obstacles; in their own ways!
Some of the most common hurdles faced by Project Managers are summarized below, to which, I bet, most of my colleagues would agree:

1.Lack of clarity on the project scope
The project scope/ brief which are supposedly THE key (!) documents forming the basis for all stakeholders as well as the teams to develop the project, plus, also act as the guiding bible against which the project’s success can be weighed, are in most common scenarios found either not appropriately defined or are all together missing!
Masters, with its experience of 10 years, insists on the importance of identifying the project scope in the initial phases of the project, which is in an agreement amongst all the stakeholders. Project scope definition not only reduces the project changes (which in turn also relates to the project timelines + project costs) but also minimizes the risk of key scope items being left-out.

 2.Scope Changes
This comes into picture only if the project scope in the first place was ever defined!
Scope change refers to any change that occurs after the initial project scope (if) has been agreed and signed-off. Some scope changes might be easy to manage and may not affect the project (timeline/ cost/ quality); however it will greatly depend on the time at which the change is initiated! 

To avoid the unnecessary impacts on time/ cost & quality, Masters continues to insist on identifying the project scope which is all-inclusive in the initial phases of the project, when the damage towards changes is reasonable!

3.Absence of Realistic & Agreed Project Schedule
It is very important for the Project Manger to set a project schedule which is realistic and agreed by the project team including the Client and all stakeholders. A schedule which is not agreed by all is equal to not having a schedule at all!
Once, if the schedule is agreed, another problem that comes in then is the commitment to the project schedule. Lack of commitment towards the agreed project schedule leads to delay in project completion.

4.Client Approvals
While Masters work as a Client’s Representative, however, Client, who is the holder of the project, his approvals work as a stamp to proceed for all activities on the project at each phase.These approvals are not needed only to proceed but they also signify Client’s conformance on the design/ documentation produced during each of the project stages.
As a Project Manager, one integrates the time-line for these approvals in the overall project schedule to ensure timely sign-offs. However, unfortunately, it is often observed that formal approvals are either never provided or if provided they take much longer than the time allocated in the project schedule; project schedule which initially was signed off. Therefore, the works are either proceeded with without an approval in place (which leads to drifts at a later stage) or with approvals which are much delayed (which leads to project delay).

5.Project Funding
Since Project Managers are usually not directly involved in the project funding matters which are undertaken by the Clients teams, Project Managers continue to remain in dark on this most important element of work as this has a direct impact on payments to be made to the contractors, vendors and service providers.

While getting work done is the prime role of Project Managers, however, in the absence of updates on monies fronts, the Project Managers are at times trapped between the contractors & clients as non-payment or delays in payment is a major issue which affects the project performance and causes project delays.

6.Timeframes for authority approvals
Every project requires approvals from various authorities ranging from the local municipalities, to utility service providers, depending on the projects size, use and location.

Although on the condition of approvals the project schedule/ cost & development is based, however, approval processes as are always complicated requiring a variety of supporting documentation and since the timeframes for these varies authority-to-authority and are often open-ended, varying on a case-to-case basis therefore there is always an uncertainty on this aspect of the project due to which most projects get delayed thereby also increasing the project cost.

7.Poor communication between teams
Most important stigma!
Clear communication between the project team is an obvious and most important requirement on any project; however it may be one of the most difficult tasks. Lack of communication or poor communication leads to issuing incomplete/ partial or unclear instructions thereby affecting the project scope/ deliverables and performance of the team.

During project execution, the contractors often communicate with a number of project team members (including the client, consultants and Project Manager) in critical situations and in the absence of properly documentation, such instructions leads to disputes which hinder the project progress.Masters maintains the importance of proper communication protocols which must be agreed and strictly followed on all projects ensuring proper flow of information and instructions to relevant parties.

8.Lack of knowledge transfer to the delivery team
In most projects, where the initial pre-construction stages are undertaken by a separate team than the construction team (who takes charge during the construction stage), during the process of knowledge and information transfer between the teams, minor details and intricacies are generally overlooked. Such lapse of information, which may be minor in nature, but if not acknowledged appropriately and in time, usually turns into major changes and affect the project in a big way in terms of time, cost and quality.

Masters, with its experience of working in various types and natures of projects, understands and acknowledges the importance of building a right team as well as maintain thorough systems & documentation through the life cycle of the project ensuring that no project information is overlooked at any stage of the project.

9.Resource sharing
 At times during multiple projects, when skilled resources are shared between projects, the team’s performance gets reduced on one of the many assignments due to pressure and commitments, thus affecting the project.

At Masters, the higher management therefore understands the importance of having in place a core team which supports the project teams at all times thereby ensuring that that the resources are not over-committed or burdened.

10.Project team’s roles and responsibilities
Poorly defined roles and responsibilities generally lead to overlap of roles which results to confusion and conflicts between the project team. While overlooking an important responsibility can hinder the project progress, at the same time, stepping over other team member’s responsibility also affects the project performance and waste valuable time.
To avoid such occurrences, Masters strongly follows a viewpoint of defining clear and detailed roles & responsibilities of the project team as well as all the stakeholders at the project initiation only as a part of the Project Execution Plan.

Sujata Gupte
(Design Manager)
Masters Mumbai

Thursday, 25 December 2014

Masters First One’s in every sector!!

Masters First One’s in every sector!!

Masters expanded its horizons over the years and like the first born child, the first projects in the different fields hold a special place as they are the foundation blocks which made Masters what it is now. Below we can see the first footprints of MASTERS in the individual stream.
RESIDENTIAL: Imperial Towers, Mumbai
Picture 1Oh!! MASTERS entered into the Residential Construction Industry and How. We jump started with a king size project i.e. the Imperial Towers which is touted as the highest existing Residential towers in India. The Project is a flagship residential complex - 253 meter high, 60 storey towers with the finest of amenities, at the heart of the city of Mumbai. The towers are built with state-of-the-art technology & finishes and using international standards of construction. The towers include a podium of 10 storey height which houses car parking, a luxury spa, clubhouse & recreational facilities and a triple-height entrance lobby. In addition to the luxury high rises, also developed are 18 slum rehabilitation buildings of G+14 to G+21 storey height to house 2664 families.

HOSPITALITY: Novotel, Mumbai
In April 2007 Eastern International HOTELS Ltd. announced with pleasure that they would be re-opening their flagship hotel in Juhu Beach Mumbai, India, as the new Novotel Hotel. Entering into thePicture 2 Hospitality Industry, with this Project MASTERS grabbed the opportunity to work on the renovation of complete Hotel with the BUA of 150,000 sq. ft. and Project cost of 77 Cr. Since the Hotel is based on the seafront within Coastal Regulation Zone, the structure could not be demolished, but almost the entire infill walls etc were torn down to re- house building services and customize the guest rooms, public areas and BOH areas as per the new operator's requirements. With the crucial contribution by MASTERS as the PMC the existing building was transformed it into a place ideal for business guests, as well as those on holidays. By the end of Jul 2009 on completion of Project The Novotel offered its Clients with 203 contemporary designed rooms having magnificent views of the Arabian Sea, meeting rooms seating up to 1000 participants, 4 specialty restaurants, a chic sea lounge, an outdoor pool, spa and fitness centre, it epitomizes a new approach to hospitality.

COMMERCIAL: DELL International, Hyderabad
Picture 3MASTERS tested the waters in the Commercial construction Industry and bagged the Project for Construction of the Dell International office Building located in Hyderabad. The Project was conceptualized in Jun 2005 with a Built Up Area of 6.00 Lack Sq. ft. Dell IT Campus is a 3,000-seat call centre for 24 x 7 operations. The building has a four storey entrance block, with other blocks of larger floor plate and multiple levels of parking.

SEZ PROJECTS: L&T Phoenix, Hyderabad
Masters has worked as a PMC for the L&T Phoenix Infoparks for their SEZ in Hyderabad. The project also involved building an incubation space for its tenants. The site was 25 acres of land with 9 Picture 4state of art IT/ITES buildings each with an average BUA of 250,000 Sq. ft. with a Total Project Value of 406 Cr.

RETAIL AND OFFICES: Infogain (Noida) & Wells Fargo (Hyderabad)
Masters has executed several interior fit-outs of which the interiors for Infogain at Noida, was one of the first. Infogain with a BUA of 90,000 Sq.ft is located in Noida NCR, India and Masters provided PMC and design services (Interior fit outs) for the Project. With this Masters also entered the field of Office interior fit outs with WELLS FARGO in Hyderabad. 
        picture 5                     Picture 6
Infogain, Noida                          Wells Fargo, Hyderabad

INDUSTRIAL: Metallsa, Jamshedpur
Picture 7With Commercial, Residential and hospitality projects in our hand, Industrial buildings were just another stepping stone. We commenced with working for the successful setting up of an industrial facility with BUA of 200,000 sq. ft.for a Mexican company's in their maiden venture in India for production of chasis for heavy vehicles for TATA - The complex housed a pre-engineered production building, administrative block, office, canteen etc. work.

CORPORATE OFFICE: Dr. Reddy's Laboratories Pvt. Ltd., Hyderabad
Picture 8After successfully handling the interior fit outs of multiple offices Masters shouldered the responsibility of completing the base building and Interiors of Dr.Reddy's corporate office at Banjara Hills, Hyderabad. The building had a BUA: 179,000 sq. ft. and the total Project cost of 50 Cr.

Picture 9RETAIL MALL: Trillium Mall, Amritsar
Masters can boast about entering into the Retail Malls constructions with a fantastic project which was Trillium Mall built by Tata Group.
The 204 CR Trillium Mall located in the Civil Lines is spread over 10.5 Lac Sq.ft. of land feet devoted to shopping area. With its multiplex and banqueting facilities the Mall has been an attraction for the residents of the city residents Masters played a crucial role as the PMC in Tata Realty’s vision to serve the city and its surrounding areas, and provide the experience of grand shopping, entertainment and socializing.

Picture 10HOSPITAL PROJECTS: Breach Candy Hospital & Research Center
Masters expanded its wings towards the medical facilities sector with the interior fit outs project of Breach Candy Hospital wherein our scope include structural strengthening works, complete refurbishment of two wards and the VVIP ward for one of Mumbai’s premier Hospitals having a built up area of 1 Lac Sq.ft and project Value of 4.5 Cr.


Dharmesh Gala 
(Project Manager)
Masters Mumbai